Skip to content
    Tank-cleaning personnel in chemical protective equipment aboard a vessel

    Tank Cleaning & Gas Freeing Support in Egypt

    Cleaning, testing and inspection-readiness support planned around cargo history, turnaround timing and the required standard.

    Service overview

    Planned around the operational requirement

    Max Marine coordinates tank cleaning, gas freeing, chemical cleaning, wall-wash testing and inspector attendance in Egypt. The cleaning plan is reviewed against the previous cargo, next-cargo specification, tank configuration and charterer requirements.

    Cleaning contractors, testing requirements, access, timing and documentation are aligned around the vessel turnaround and the nominated inspection standard.

    Slops and waste arising from the work are handled through a separately reviewed Waste Management scope so the reception route, contractor and disposal documentation remain clear.

    Discuss Tank Cleaning
    Tank-cleaning personnel wearing respiratory and chemical protective equipment aboard a vessel

    1 / 2

    Included scope

    What we handle

    The working scope is confirmed against the vessel, cargo, site or project requirement before execution.

    1. 01
      Tank cleaning coordination
    2. 02
      Gas freeing coordination
    3. 03
      Chemical cleaning coordination
    4. 04
      Wall-wash testing
    5. 05
      Inspector attendance
    6. 06
      Tank inspection preparation
    7. 07
      Slop and waste-route coordination
    8. 08
      Cleaning and close-out documentation

    Often Coordinated With

    Buyer guidance

    Common operational questions

    The answers below are general planning guidance. Port, authority, vessel and timing requirements are confirmed for the specific operation.

    Can inspector attendance be arranged?

    Inspector attendance and wall-wash testing can be coordinated where required by the agreed cleaning standard.

    Need tank cleaning support in Egypt?

    Share the previous cargo, next-cargo specification, tank configuration and inspection requirement for review.

    Open detailed form